Shingles were just getting started.
The transom above the back door was installed. The window on the left was damaged and had to be reordered.
They also installed thee gas fireplace in the great room.
The arches have been done in some of the doorways throughout the house.
Here are the photos from yesterday.
The shingles are almost done.
The tub in the Jack and Jill bath was installed.
The short wall for the kitchen wall was framed. Unfortunately they made it 46" instead of 42". There was some discussion on what the correct bar height was. The builder thought it was 42", then we decided 46". I went home and measured my bar stools and sent his assistant an email to make it 42" but the framers didn't get the memo so they'll need to shorten it.
It's hard to see, but pretty much all the wiring has been done. Gas lines have also been plumbed. I had an extra gas line installed on the back deck area. They are also running speaker wire for the surround sound. Four speakers in the great room and two on the back deck. Also an extra cable outlet on the back deck area. They will also be installing a security system.
The shower pan and the jetted tub in the master have been installed.
So things are moving along nicely. Of course there would have to be one fly in the ointment. My neighborhood has these black street lights that are placed every so often down the street. One of them is in the corner of my lot. When I pulled up yesterday I noticed the pole was tilted at an angle. When I took a closer look I could see that the pole has been completely broken at the bottom and when I touched it, it became obvious that it is probably going to fall into the street soon. Judging from the damage it looks like a big truck struck it. Probably the guy delivering the shingles. I'm sure the crew let the builder know about it right away... haha. I'm sure he won't be happy.